CND header

AIA Home > SBSE Home > Teaching Resources > Carbon Neutral Design > Carbon Neutral Teaching > Theis - Comprehensive Building Design Studio > Details

arrow Project Introduction

arrow What is Carbon Neutral Design?

arrow Carbon Neutral Design Process

arrow Carbon Neutral Design Strategies

arrow Carbon Calculation Protocols

arrow Carbon Calculation Tools

arrow Carbon Neutral Case Studies

arrow Carbon Neutral Teaching

Curriculum Projects Overview

Projects (by professor):

> Bagneid
> Boake
> Chalfoun
> Demers + Potvin
> Elzeyadi
> Guzowski
> Haglund
> Kaiser
> La Roche
> Peña
> Rashed-Ali
> Stannard
dot Theis
Comprehensive Building Studio
Site Analysis - Senses
Site Analysis - Topography & Vegetation
Site Analysis - Climate
Site Analysis - Site Visit
Design Strategy - Sustainable Elements
Schematic Design - Resource Consumption
Design Development - Envelope
Design Development - Details

> Thomson

Projects (by teaching topic):
visit this link to see the projects sorted by the carbon related topic

> Frameworks and Goals
> Site
> Building Form / Integrated Design Overview
> Envelope
> Passive Strategies
> Efficient Mechanical Strategies
> Energy
> Materials
> Water
> Miscellaneous Related Topics
> Integrated Topics

arrow Resources

arrow Links

 
The Carbon Neutral Design Project:
Carbon Neutral Teaching: Curriculum Materials Development
Chris Theis
School of Architecture, Louisiana State University

Comprehensive Architectural Design Studio
Senior Studio

Design Development - Details

Wall Sections
The drawings above are from a partial set of construction
drawings the student produced in a companion course.
During the second half of the design studio course there
is a direct connection with the companion course,
which focuses on contemporary methods of producing
construction documenments.

Design Performance Objective

Comprehensive Building Design Project:
William M Colmer Visitors Center and Park Headquarters

Design Development - Details

Student: Amy Fruge
Software/Tools:

Fall 2007 Arch. 5001 (UG) Comprehensive Architectural Design Studio

Part 8 - Design Development - Details

These images illustrate the design development phase of the project and specifically the refi nement of the building envelope to assure that it will meet the performance expectations of the initial computer simulations.

 

Investigative Strategy

Use COMcheck and BuildingGreen Suite in the design and detailing of the building envelope.

 

Evaluation Process

Accurate utilization of COMcheck, especially the proper input of information and the validation of this information through detailed drawings.

 

Evaluative Criteria

Accuracy.
Evaluating the quality of the drawings was the responsibility of the instructor of the companion course.

 

Cautions - Possible Confusions
This portion of the project obviously requires close coordination with another course. We haven’t experienced any problems, but it could be a potential problem.
Range of Applicability in terms of CLIMATE
This type of project responded to the HOT HUMID climate zone in this instance, but it can easily be modified to suit any climate type.
Range of Applicability in terms of TYPE
This type of approach is suitable for any scale or type of building.
Reference Material
COMcheck http://www.energycodes.gov/comcheck/
BuildingGreen Suite www.buildinggreen.com
Stein, Reynolds, Grondzik, Kwok. Mechanical and Electrical Equipment for Buildings.
Wakita, Osamu A. and Richard M. Linde. The Professional Practice of Architectural Working Drawings.
Duration of Exercise
Approximately one month.
Degree of Difficulty / Previous Knowledge Required
Can be quite difficult for some students, depending on their previous experience.


   

 

©2012 American Institute of Architects | Society of Building Science Educators | Legal Disclaimer