Terri Meyer Boake BES BArch MArch LEED AP Associate Professor :: Associate Director :: School of Architecture :: University of Waterloo |
Renovation to the Art Gallery of Ontario ... the south facade Frank Gehry Architect Toronto, Ontario
|
Project Information: |
Design
Architect: Frank Gehry Flynn also
did the cladding on the addition to OCAD, adjacent. The
exterior is to be finished with a blue coloured titanium. Approximate
size, 2' x 3'. |
|
||||||
Project
Images: June 2007
|
|
|
|
The glulam framing can be seen
at the large T shaped opening on the south facade.
|
There are many
layers beneath the titanium cladding (yet to come). On the east side
the workers are completing the alumimum layer, which will lie beneath
the titanium. |
|
|
This is the lower landing for
the external stair that spirals down the back facade.
|
The steel framing,
fireproofed, can be seen behind the glulam system that will support
the windows. |
A view from the 6th floor of the
OCAD tabletop.
|
Until all of the sections of the
stair framing are in place, it must be supported by cables.
|
The white painted steel forms
the upper and lower landing of the external (enclosed) stair.
|
A view up the west side of the
building. You can see the rigid fibreglass insulation (yellow) that
is being slowly covered by the aluminum layer.
|
The
underside of the steel stair framing.
|
Closer view of the glulam window
framing.
|
View up the south facade.
|
Oblique view of the rear facade looking over the Grange roof. |
As much of the wood is kept wrapped to prevent moisture
damage, before the glazing is installed.
|
A view of the south facade from Grange Park.
|
Workers installing cladding.
|
Here we see the aluminum layer going on. There is a 1/2"
air space between this layer and the insulation below.
|
To the left we see the girts on
the air barrier/Blueskin. The girt spaces will be filled in with rigid
insulation, seen on the right, and topped with aluminum sheet.
|
Workers peer out
the windows. |
The girt layer begins on the
south facade. |
Closer view of
the girts being installed. |
Project Images: August 2007 | |
. |
|
You
can see a few more layers are complete on the south elevation at the
west end. |
The
glass curtain wall is being installed. |
Closer
view of the junction between the glazed and solid clad portions of the
south facade. |
View
of the many layers in progress... |
The
glazing approaches the steel stair that will spiral its way down the
south facade. |
Closer view of the glazing and facade details. |
View
of the west facade. |
Closer
view of the west facade - facade work being done by Flynn (who also did
OCAD next door). |
...spaces reserved
in anticipation of some blue titanium later... |
|
back to steel projects gallery
These images are for educational use only and may not be reproduced commercially without written permission. tboake@sympatico.ca |
Updated June 17, 2008